ATM_ID: 7357D073-73A2-1014-B6C0-D6A156619FB6 MFF: PLANNEDTIMESTAFF: ID: DPQA_Regression_COPY-PRINT/Testcases/SPAR/R16-08_Test_Cases/83251 TESTCASE_HEADLINE: [SPAR]->CQGbl00937584_2 To verify whether the Pre-Printed paper is getting printed the job, submitted via LPR. GROUP: FEATURE: SUB_FEATURE: INPUT:

  1. Download the attached ".ps" files from the CQ and save it in the PC.
PROCEDURE:

  1. LPR the following 3 documents to the device (all document created with the X-GPD PS driverv5.469.10.8 by 3rd Level)
    a. “pagelayout_trayselection_2sided_1page.ps”
    b. “printdriver_trayselection_1sided_2pages.ps”
    c. “printdriver_trayselection_2sided_1page.ps”
  2. The job will prompt "Held for the Resources" load the Pre-Printed paper into an internal tray down and rotated by 180 degree (it should be loaded per the picture in the tray).
    3 Confirm the paper tray as A4 LEF, Preprinted, White. verify(1).
     
    Note : 1. Submit print jobs via CWIS Print \ Reliability tool and continue steps (2) & (3) and confirm (1).
OUTPUT:

  1. It should print on the Pre-Printed side of the paper successfully.
PROCESS: PRIORITY: TEST_TYPE: LOE: RESOURCE_HW: RESOURCE_CONSUMEABLES: RESOURCE_MEDIA: SKILL_SET: TEST_CASE_TYPE: TESTCASE_SOURCE: SPEC: SPEC_VERSION: SPEC_TAG: Mapping Not Required ATM_OWNER: APPROVE_QE: APPROVED_QE: APPROVE_SE: APPROVED_SE: APPROVE_SPAR: APPROVED_SPAR: ASSOCIATED_TESTCASES: TRAINING: TESTCASE_VERSION: TESTCASE_STATE: TESTCASE_PLATFORM: TESTCASE_PRODUCT: TESTCASE_APPROVALS: CDATE: 1476023210 MDATE: 1476023210 MUSER: w4939RDM AUTHOR: w4939RDM ATM_MCOMMENTS: Imported from CSV HISTORY: ATM_LOCKED: ATM_REQLINK: ATM_REQCOUNT: 0 QA_TEAM: TC_WEIGHTAGE: FILENAME: FILEDESC: FILES: